Increase in machine efficiency
50min Reduction in average tool change time from 180 min
10% Reduction in WIP inventory
Challenge
Are you facing a lack of machine capacity?
Do you have low OEE?
Do you have an overcrowded warehouse due to the need for large production batches?
Where you may now be
Where we will take you
Our OEE (machine efficiency) is high = 86%
We have been able to reduce CAPEX on the acquisition of additional machinery and also no longer have such a need for weekend shifts
We have been able to reduce the average tool change time from 180 min to 50 min
We have reduced WIP inventory by 10%
We have standardized work of the setter
We have a standardized system of connecting tools to machines
We have improved and refined the execution of the production plan
Definition, scope of the project
Streamlining workplace synchronization in multi-level production
Streamlining workplace synchronization in multi-level production
Standardization and organization of the work of the setter
Reduction of unproductive machine time during tool change
We have the experience and practical knowledge gained during past implementations with other clients
We will prepare a time study of individual process steps
We will prepare a detailed list of tool change activities (workflow) for the adjusters, including times
We will divide the adjuster activities into 2 categories according to whether they can be implemented during the production process or not
We will provide technical adjustment of machines and tools to a uniform quick coupler standard
We will arrange for the installation of preheaters